CLIENT:

Alsea River Bridge

Oregon

PROJECT:

100 tons – Fabricated 2 large traveler assemblies that were used as constructions aids in the setting of Alsea River Concrete Bridge Structure. Work included fabricating (2) heavy weldments that had to be match bored to accept several 4” diameter connecting pins.

ALSEA RIVER BRIDGE